The construction of a new road – whether from asphalt or concrete – requires the production of an excellently bonded pavement structure, beginning with a stable base layer and going all the way to a precisely leveled surface course.
Asphalt paving requires an exceptionally high degree of meticulous logistical planning and management. Care needs to be taken that sufficient quantities of mix are available on site all the time, and that the mix will not cool down prematurely.